hrcak mascot   Srce   HID

Stručni rad

Donaustadtbrücke Bridge in Vienna

Gerald Foller

Puni tekst: hrvatski, pdf (539 KB) str. 989-996 preuzimanja: 893* citiraj
APA 6th Edition
Foller, G. (2006). Most Donaustadtbrücke u Beču. Građevinar, 58 (12.), 989-996. Preuzeto s https://hrcak.srce.hr/8928
MLA 8th Edition
Foller, Gerald. "Most Donaustadtbrücke u Beču." Građevinar, vol. 58, br. 12., 2006, str. 989-996. https://hrcak.srce.hr/8928. Citirano 30.09.2020.
Chicago 17th Edition
Foller, Gerald. "Most Donaustadtbrücke u Beču." Građevinar 58, br. 12. (2006): 989-996. https://hrcak.srce.hr/8928
Harvard
Foller, G. (2006). 'Most Donaustadtbrücke u Beču', Građevinar, 58(12.), str. 989-996. Preuzeto s: https://hrcak.srce.hr/8928 (Datum pristupa: 30.09.2020.)
Vancouver
Foller G. Most Donaustadtbrücke u Beču. Građevinar [Internet]. 2006 [pristupljeno 30.09.2020.];58(12.):989-996. Dostupno na: https://hrcak.srce.hr/8928
IEEE
G. Foller, "Most Donaustadtbrücke u Beču", Građevinar, vol.58, br. 12., str. 989-996, 2006. [Online]. Dostupno na: https://hrcak.srce.hr/8928. [Citirano: 30.09.2020.]

Sažetak
Several bridges had to be built across the Danube River in Vienna to enable construction of the Freudenau Hydropower Plant. The Donaustadtbrücke Bridge had to be built so that the traffic can be maintained during erection of the Praterbrücke Bridge (A23). The cable-stayed bridge was designed in such a way that it can be put to different uses during its design life. First it was used as a two-lane road bridge, but is being converted since 2006 to accommodate the metro traffic. Once the quantity of cables is doubled, the bridge will be able to withstand higher loads.

Ključne riječi
Donaustadtbrücke Bridge; Praterbrücke Bridge; Danube; cable-stayed bridge; road bridge; metro bridge

Hrčak ID: 8928

URI
https://hrcak.srce.hr/8928

[hrvatski]

Posjeta: 1.212 *