hrcak mascot   Srce   HID

Preliminary communication

Possibilities and limitations of constructability concept in construction industry in Croatia

Nataša Turina ; Sveučilište u Rijeci, Građevinski fakultet, Radmile Matejčić 3, 51000 Rijeka, Croatia
Diana Car-Pušić ; Sveučilište u Rijeci, Građevinski fakultet, Radmile Matejčić 3, 51000 Rijeka, Croatia
Mladen Radujković ; Sveučilište u Zagrebu, Građevinski fakultet, A. Kačića-Miošića 26, 10000 Zagreb, Croatia

Fulltext: english, pdf (431 KB) pages 167-176 downloads: 1.933* cite
APA 6th Edition
Turina, N., Car-Pušić, D. & Radujković, M. (2013). Possibilities and limitations of constructability concept in construction industry in Croatia. Tehnički vjesnik, 20 (1), 167-176. Retrieved from https://hrcak.srce.hr/97495
MLA 8th Edition
Turina, Nataša, et al. "Possibilities and limitations of constructability concept in construction industry in Croatia." Tehnički vjesnik, vol. 20, no. 1, 2013, pp. 167-176. https://hrcak.srce.hr/97495. Accessed 6 Dec. 2019.
Chicago 17th Edition
Turina, Nataša, Diana Car-Pušić and Mladen Radujković. "Possibilities and limitations of constructability concept in construction industry in Croatia." Tehnički vjesnik 20, no. 1 (2013): 167-176. https://hrcak.srce.hr/97495
Harvard
Turina, N., Car-Pušić, D., and Radujković, M. (2013). 'Possibilities and limitations of constructability concept in construction industry in Croatia', Tehnički vjesnik, 20(1), pp. 167-176. Available at: https://hrcak.srce.hr/97495 (Accessed 06 December 2019)
Vancouver
Turina N, Car-Pušić D, Radujković M. Possibilities and limitations of constructability concept in construction industry in Croatia. Tehnički vjesnik [Internet]. 2013 [cited 2019 December 06];20(1):167-176. Available from: https://hrcak.srce.hr/97495
IEEE
N. Turina, D. Car-Pušić and M. Radujković, "Possibilities and limitations of constructability concept in construction industry in Croatia", Tehnički vjesnik, vol.20, no. 1, pp. 167-176, 2013. [Online]. Available: https://hrcak.srce.hr/97495. [Accessed: 06 December 2019]
Fulltext: croatian, pdf (431 KB) pages 167-176 downloads: 204* cite
APA 6th Edition
Turina, N., Car-Pušić, D. & Radujković, M. (2013). Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj. Tehnički vjesnik, 20 (1), 167-176. Retrieved from https://hrcak.srce.hr/97495
MLA 8th Edition
Turina, Nataša, et al. "Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj." Tehnički vjesnik, vol. 20, no. 1, 2013, pp. 167-176. https://hrcak.srce.hr/97495. Accessed 6 Dec. 2019.
Chicago 17th Edition
Turina, Nataša, Diana Car-Pušić and Mladen Radujković. "Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj." Tehnički vjesnik 20, no. 1 (2013): 167-176. https://hrcak.srce.hr/97495
Harvard
Turina, N., Car-Pušić, D., and Radujković, M. (2013). 'Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj', Tehnički vjesnik, 20(1), pp. 167-176. Available at: https://hrcak.srce.hr/97495 (Accessed 06 December 2019)
Vancouver
Turina N, Car-Pušić D, Radujković M. Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj. Tehnički vjesnik [Internet]. 2013 [cited 2019 December 06];20(1):167-176. Available from: https://hrcak.srce.hr/97495
IEEE
N. Turina, D. Car-Pušić and M. Radujković, "Mogućnosti i ograničenja implementacije koncepta izgradivosti u građevinskoj industriji u Hrvatskoj", Tehnički vjesnik, vol.20, no. 1, pp. 167-176, 2013. [Online]. Available: https://hrcak.srce.hr/97495. [Accessed: 06 December 2019]

Abstracts
The constructability concept development was triggered by the attempts to integrate the contractor knowledge and experience at the design stage. The very selection of the appropriate procurement model during the contract stage represents one of the concept implementation models. This paper deals with the stage and project participant integration, those being the essential constructability concept implementation elements. For this purpose a research including five Croatian building construction projects was conducted. The construction projects were analysed and described by applying the "multiple case study" scientific method. This paper presents the processing algorithm and results for the two selected cases, the first of which with the traditional procurement model and the second with the alternative management oriented procurement model, as well as the results of the case study conducted on all five projects. The results lead to specific conclusions and recommendations for applying the models at the markets of less developed countries. The changes in construction project traditional procurement model domination cannot be made radically due to cultural and financial reasons. They require a change of awareness and investment of significant resources. Due to the stated reasons an improved traditional procurement model introduction is proposed. The measurement introduction must be adapted to every single project. In order to improve the construction project procurement procedures, one must make an influence on the wider community where the project takes place and influence the changes primarily within the legislative and the institutional frames.

Keywords
comparative analysis; constructability; multiple case study; procurement models

Hrčak ID: 97495

URI
https://hrcak.srce.hr/97495

[croatian]

Visits: 2.383 *