hrcak mascot   Srce   HID

Stručni rad

Realization of Stupe hydropower tunnel

Pavao Lakoš

Puni tekst: hrvatski, pdf (707 KB) str. 61-68 preuzimanja: 1.793* citiraj
APA 6th Edition
Lakoš, P. (2004). Izvedba hidrotehničkog tunela Stupe. Građevinar, 56 (02.), 61-68. Preuzeto s https://hrcak.srce.hr/10170
MLA 8th Edition
Lakoš, Pavao. "Izvedba hidrotehničkog tunela Stupe." Građevinar, vol. 56, br. 02., 2004, str. 61-68. https://hrcak.srce.hr/10170. Citirano 24.09.2020.
Chicago 17th Edition
Lakoš, Pavao. "Izvedba hidrotehničkog tunela Stupe." Građevinar 56, br. 02. (2004): 61-68. https://hrcak.srce.hr/10170
Harvard
Lakoš, P. (2004). 'Izvedba hidrotehničkog tunela Stupe', Građevinar, 56(02.), str. 61-68. Preuzeto s: https://hrcak.srce.hr/10170 (Datum pristupa: 24.09.2020.)
Vancouver
Lakoš P. Izvedba hidrotehničkog tunela Stupe. Građevinar [Internet]. 2004 [pristupljeno 24.09.2020.];56(02.):61-68. Dostupno na: https://hrcak.srce.hr/10170
IEEE
P. Lakoš, "Izvedba hidrotehničkog tunela Stupe", Građevinar, vol.56, br. 02., str. 61-68, 2004. [Online]. Dostupno na: https://hrcak.srce.hr/10170. [Citirano: 24.09.2020.]

Sažetak
The realization of the Stupe hydropower tunnel, a significant structure forming part of the Spilt/Solin sewerage system, is described. Basic technical data about the tunnel are presented. The realization of the works in the period from 1999 to 2002 is presented in more detail. Some particular features of the excavation and primary support work are given, and an overview of the quality of work is presented. It is emphasized that the work on this demanding project was carried out in accordance with high quality standards. In addition, valuable experience was gained with respect to the construction of tunnels of small cross-section in soft rock.

Ključne riječi
Split-Solin sewerage system; Stupe hydropower tunnel; realization of works; quality of works; small cross-section tunnel; soft rock

Hrčak ID: 10170

URI
https://hrcak.srce.hr/10170

[hrvatski]

Posjeta: 2.032 *