hrcak mascot   Srce   HID

Izvorni znanstveni članak
https://doi.org/10.17559/TV-20150312154507

The single machine serial batch production scheduling with outsourcing allowed

Juan Zou ; (1) School of Management, Qufu Normal University, Rizhao, Shandong, 276826, China; (2) School of Mathematical Sciences, Qufu Normal University, Qufu, Shandong, 273165, China
Yuzhong Zhang ; School of Management, Qufu Normal University, Rizhao, Shandong, 276826, China
Cuixia Miao ; School of Mathematical Sciences, Qufu Normal University, Qufu, Shandong, 273165, China

Puni tekst: engleski, pdf (839 KB) str. 297-302 preuzimanja: 363* citiraj
APA 6th Edition
Zou, J., Zhang, Y. i Miao, C. (2015). The single machine serial batch production scheduling with outsourcing allowed. Tehnički vjesnik, 22 (2), 297-302. https://doi.org/10.17559/TV-20150312154507
MLA 8th Edition
Zou, Juan, et al. "The single machine serial batch production scheduling with outsourcing allowed." Tehnički vjesnik, vol. 22, br. 2, 2015, str. 297-302. https://doi.org/10.17559/TV-20150312154507. Citirano 18.10.2019.
Chicago 17th Edition
Zou, Juan, Yuzhong Zhang i Cuixia Miao. "The single machine serial batch production scheduling with outsourcing allowed." Tehnički vjesnik 22, br. 2 (2015): 297-302. https://doi.org/10.17559/TV-20150312154507
Harvard
Zou, J., Zhang, Y., i Miao, C. (2015). 'The single machine serial batch production scheduling with outsourcing allowed', Tehnički vjesnik, 22(2), str. 297-302. https://doi.org/10.17559/TV-20150312154507
Vancouver
Zou J, Zhang Y, Miao C. The single machine serial batch production scheduling with outsourcing allowed. Tehnički vjesnik [Internet]. 2015 [pristupljeno 18.10.2019.];22(2):297-302. https://doi.org/10.17559/TV-20150312154507
IEEE
J. Zou, Y. Zhang i C. Miao, "The single machine serial batch production scheduling with outsourcing allowed", Tehnički vjesnik, vol.22, br. 2, str. 297-302, 2015. [Online]. https://doi.org/10.17559/TV-20150312154507
Puni tekst: hrvatski, pdf (839 KB) str. 297-302 preuzimanja: 278* citiraj
APA 6th Edition
Zou, J., Zhang, Y. i Miao, C. (2015). Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing. Tehnički vjesnik, 22 (2), 297-302. https://doi.org/10.17559/TV-20150312154507
MLA 8th Edition
Zou, Juan, et al. "Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing." Tehnički vjesnik, vol. 22, br. 2, 2015, str. 297-302. https://doi.org/10.17559/TV-20150312154507. Citirano 18.10.2019.
Chicago 17th Edition
Zou, Juan, Yuzhong Zhang i Cuixia Miao. "Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing." Tehnički vjesnik 22, br. 2 (2015): 297-302. https://doi.org/10.17559/TV-20150312154507
Harvard
Zou, J., Zhang, Y., i Miao, C. (2015). 'Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing', Tehnički vjesnik, 22(2), str. 297-302. https://doi.org/10.17559/TV-20150312154507
Vancouver
Zou J, Zhang Y, Miao C. Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing. Tehnički vjesnik [Internet]. 2015 [pristupljeno 18.10.2019.];22(2):297-302. https://doi.org/10.17559/TV-20150312154507
IEEE
J. Zou, Y. Zhang i C. Miao, "Planiranje serijske proizvodnje na jednom stroju uz dopušteni outsourcing", Tehnički vjesnik, vol.22, br. 2, str. 297-302, 2015. [Online]. https://doi.org/10.17559/TV-20150312154507

Sažetak
We consider several serial batch scheduling problems with outsourcing allowed. Each job can be either processed on the in-house machine or outsourced. The objective is to minimize the weighted sum of the scheduling cost and the total outsourcing cost. We discuss three classical scheduling objective functions. The first is the total completion time, the second is the maximum lateness, and the third is the weighted number of late jobs. For each problem, we derive an efficient dynamic programming algorithm that minimizes the total cost.

Ključne riječi
dynamic programming; outsourcing; scheduling; serial batching

Hrčak ID: 138080

URI
https://hrcak.srce.hr/138080

[hrvatski]

Posjeta: 962 *