Skoči na glavni sadržaj

Prethodno priopćenje

STRESSES IN MULTIPHASE EXCAVATION OF TUNELL

Lidija Frgić
Krešimir Tor
Tomislav Hrestak


Puni tekst: hrvatski pdf 637 Kb

str. 63-70

preuzimanja: 1.807

citiraj


Sažetak

Foreseeing of the rock massif behaviour in tunnel breaking out is a complex engineering problem. In projecting it is important to evaluate the stability conditions in excavation and after the acceptance of suitable breaking out methods, the acceptance of supporting in order to stabilize the opening. The New Austrian Tunnel Method (NATM) is the excavation method adaptable to frequent changes of geological and geotechnical conditions at the working face. Beside the excavation of the whole profile, excavations in soft materials along the tunnel trace condition, so called profile development, i. e. the application of multi-phase excavation. The conditions of stresses and strains for the whole-profile excavation are compared with the conditions of stresses and strains for starting stages of multi-phase excavations with the New Austrian Tunnel Method.

Ključne riječi

tunnel; multi-phase New Austrian Tunnel Method; numerical analysis; Boundary Element Method

Hrčak ID:

13390

URI

https://hrcak.srce.hr/13390

Datum izdavanja:

4.12.2003.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.622 *