Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application
Michał Sąsiadek
orcid.org/0000-0002-7804-9459
; University of Zielona Góra, Faculty of Mechanical Engineering, Institute of Management and Production Engineering, ul. Prof. Szafrana 4, Zielona Góra, 65-516, Poland
APA 6th Edition Sąsiadek, M. (2015). Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application. Tehnički vjesnik, 22 (3), 643-648. https://doi.org/10.17559/TV-20130428111356
MLA 8th Edition Sąsiadek, Michał. "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application." Tehnički vjesnik, vol. 22, br. 3, 2015, str. 643-648. https://doi.org/10.17559/TV-20130428111356. Citirano 26.02.2021.
Chicago 17th Edition Sąsiadek, Michał. "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application." Tehnički vjesnik 22, br. 3 (2015): 643-648. https://doi.org/10.17559/TV-20130428111356
Harvard Sąsiadek, M. (2015). 'Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application', Tehnički vjesnik, 22(3), str. 643-648. https://doi.org/10.17559/TV-20130428111356
Vancouver Sąsiadek M. Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application. Tehnički vjesnik [Internet]. 2015 [pristupljeno 26.02.2021.];22(3):643-648. https://doi.org/10.17559/TV-20130428111356
IEEE M. Sąsiadek, "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application", Tehnički vjesnik, vol.22, br. 3, str. 643-648, 2015. [Online]. https://doi.org/10.17559/TV-20130428111356
APA 6th Edition Sąsiadek, M. (2015). Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena. Tehnički vjesnik, 22 (3), 643-648. https://doi.org/10.17559/TV-20130428111356
MLA 8th Edition Sąsiadek, Michał. "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena." Tehnički vjesnik, vol. 22, br. 3, 2015, str. 643-648. https://doi.org/10.17559/TV-20130428111356. Citirano 26.02.2021.
Chicago 17th Edition Sąsiadek, Michał. "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena." Tehnički vjesnik 22, br. 3 (2015): 643-648. https://doi.org/10.17559/TV-20130428111356
Harvard Sąsiadek, M. (2015). 'Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena', Tehnički vjesnik, 22(3), str. 643-648. https://doi.org/10.17559/TV-20130428111356
Vancouver Sąsiadek M. Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena. Tehnički vjesnik [Internet]. 2015 [pristupljeno 26.02.2021.];22(3):643-648. https://doi.org/10.17559/TV-20130428111356
IEEE M. Sąsiadek, "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena", Tehnički vjesnik, vol.22, br. 3, str. 643-648, 2015. [Online]. https://doi.org/10.17559/TV-20130428111356
Sažetak In the first part of the article, a method of assembly sequence planning and analysis of construction of the designed product parts allowing for principles of "designing for assembly" has been presented. This article presents a computer programme which constitutes the implementation of this method and its application is presented on a real-life, industrial example. The article presents the way how to use the computer programme in order to select the set of allowable assembly sequences and choose the most beneficial one as well as to apply the programme to analyse and design the parts construction in such a way that these parts are characterised by "easy and cheap" assembly.