hrcak mascot   Srce   HID

Izvorni znanstveni članak
https://doi.org/10.17559/TV-20130428111356

Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application

Michał Sąsiadek   ORCID icon orcid.org/0000-0002-7804-9459 ; University of Zielona Góra, Faculty of Mechanical Engineering, Institute of Management and Production Engineering, ul. Prof. Szafrana 4, Zielona Góra, 65-516, Poland

Puni tekst: engleski, pdf (2 MB) str. 643-648 preuzimanja: 318* citiraj
APA 6th Edition
Sąsiadek, M. (2015). Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application. Tehnički vjesnik, 22 (3), 643-648. https://doi.org/10.17559/TV-20130428111356
MLA 8th Edition
Sąsiadek, Michał. "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application." Tehnički vjesnik, vol. 22, br. 3, 2015, str. 643-648. https://doi.org/10.17559/TV-20130428111356. Citirano 26.02.2021.
Chicago 17th Edition
Sąsiadek, Michał. "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application." Tehnički vjesnik 22, br. 3 (2015): 643-648. https://doi.org/10.17559/TV-20130428111356
Harvard
Sąsiadek, M. (2015). 'Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application', Tehnički vjesnik, 22(3), str. 643-648. https://doi.org/10.17559/TV-20130428111356
Vancouver
Sąsiadek M. Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application. Tehnički vjesnik [Internet]. 2015 [pristupljeno 26.02.2021.];22(3):643-648. https://doi.org/10.17559/TV-20130428111356
IEEE
M. Sąsiadek, "Planning and analysis of mechanical assembly sequences in design engineering – Part II: Application", Tehnički vjesnik, vol.22, br. 3, str. 643-648, 2015. [Online]. https://doi.org/10.17559/TV-20130428111356
Puni tekst: hrvatski, pdf (2 MB) str. 643-648 preuzimanja: 352* citiraj
APA 6th Edition
Sąsiadek, M. (2015). Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena. Tehnički vjesnik, 22 (3), 643-648. https://doi.org/10.17559/TV-20130428111356
MLA 8th Edition
Sąsiadek, Michał. "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena." Tehnički vjesnik, vol. 22, br. 3, 2015, str. 643-648. https://doi.org/10.17559/TV-20130428111356. Citirano 26.02.2021.
Chicago 17th Edition
Sąsiadek, Michał. "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena." Tehnički vjesnik 22, br. 3 (2015): 643-648. https://doi.org/10.17559/TV-20130428111356
Harvard
Sąsiadek, M. (2015). 'Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena', Tehnički vjesnik, 22(3), str. 643-648. https://doi.org/10.17559/TV-20130428111356
Vancouver
Sąsiadek M. Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena. Tehnički vjesnik [Internet]. 2015 [pristupljeno 26.02.2021.];22(3):643-648. https://doi.org/10.17559/TV-20130428111356
IEEE
M. Sąsiadek, "Planiranje i analiza toka operacija montaže u projektiranju – Dio II: Primjena", Tehnički vjesnik, vol.22, br. 3, str. 643-648, 2015. [Online]. https://doi.org/10.17559/TV-20130428111356

Sažetak
In the first part of the article, a method of assembly sequence planning and analysis of construction of the designed product parts allowing for principles of "designing for assembly" has been presented. This article presents a computer programme which constitutes the implementation of this method and its application is presented on a real-life, industrial example. The article presents the way how to use the computer programme in order to select the set of allowable assembly sequences and choose the most beneficial one as well as to apply the programme to analyse and design the parts construction in such a way that these parts are characterised by "easy and cheap" assembly.

Ključne riječi
assembly sequence planning; computer program; design for assembly; engineering design

Hrčak ID: 139748

URI
https://hrcak.srce.hr/139748

[hrvatski]

Posjeta: 1.018 *