REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

Mladen Zelenika
Božo Soldo

Fulltext: english, pdf (1 MB) pages 97-102 downloads: 919* cite
APA 6th Edition
Zelenika, M. & Soldo, B. (1998). REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION. Rudarsko-geološko-naftni zbornik, 10 (1), 97-102. Retrieved from https://hrcak.srce.hr/13475
MLA 8th Edition
Zelenika, Mladen and Božo Soldo. "REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION." Rudarsko-geološko-naftni zbornik, vol. 10, no. 1, 1998, pp. 97-102. https://hrcak.srce.hr/13475. Accessed 18 Nov. 2019.
Chicago 17th Edition
Zelenika, Mladen and Božo Soldo. "REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION." Rudarsko-geološko-naftni zbornik 10, no. 1 (1998): 97-102. https://hrcak.srce.hr/13475
Harvard
Zelenika, M., and Soldo, B. (1998). 'REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION', Rudarsko-geološko-naftni zbornik, 10(1), pp. 97-102. Available at: https://hrcak.srce.hr/13475 (Accessed 18 November 2019)
Vancouver
Zelenika M, Soldo B. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION. Rudarsko-geološko-naftni zbornik [Internet]. 1998 [cited 2019 November 18];10(1):97-102. Available from: https://hrcak.srce.hr/13475
IEEE
M. Zelenika and B. Soldo, "REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION", Rudarsko-geološko-naftni zbornik, vol.10, no. 1, pp. 97-102, 1998. [Online]. Available: https://hrcak.srce.hr/13475. [Accessed: 18 November 2019]

Abstracts
A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

Keywords
drilling bit; drilling method; well; screen; casing; design of well; well diameter