hrcak mascot   Srce   HID

Stručni rad
https://doi.org/10.21278/brod68406

TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA

Većeslav Čorić ; Faculty of Mechanical Engineering and Naval Architecture University of Zagreb, 10000 Zagreb, Ivana Lučića 5
Smiljko Rudan ; Faculty of Mechanical Engineering and Naval Architecture University of Zagreb, 10000 Zagreb, Ivana Lučića 5
Slobodan Maksimović ; Aramanija d.o.o., 21000 Split, Ruđera Boškovića 5

Puni tekst: engleski, pdf (2 MB) str. 89-102 preuzimanja: 448* citiraj
APA 6th Edition
Čorić, V., Rudan, S. i Maksimović, S. (2017). TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA. Brodogradnja, 68 (4), 89-102. https://doi.org/10.21278/brod68406
MLA 8th Edition
Čorić, Većeslav, et al. "TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA." Brodogradnja, vol. 68, br. 4, 2017, str. 89-102. https://doi.org/10.21278/brod68406. Citirano 21.10.2021.
Chicago 17th Edition
Čorić, Većeslav, Smiljko Rudan i Slobodan Maksimović. "TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA." Brodogradnja 68, br. 4 (2017): 89-102. https://doi.org/10.21278/brod68406
Harvard
Čorić, V., Rudan, S., i Maksimović, S. (2017). 'TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA', Brodogradnja, 68(4), str. 89-102. https://doi.org/10.21278/brod68406
Vancouver
Čorić V, Rudan S, Maksimović S. TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA. Brodogradnja [Internet]. 2017 [pristupljeno 21.10.2021.];68(4):89-102. https://doi.org/10.21278/brod68406
IEEE
V. Čorić, S. Rudan i S. Maksimović, "TECHNOLOGY OF SUBSEA PIPELINE LAYING IN THE COASTAL AREA", Brodogradnja, vol.68, br. 4, str. 89-102, 2017. [Online]. https://doi.org/10.21278/brod68406

Sažetak
The paper describes technology applied in laying the subsea crude oil pipeline in the coastal area of the northern Adriatic, between the steep coasts of island Krk and mainland. Very detailed functional plan was produced in order to avoid possible critical and unexpected situations in the installation process. The most critical actions of the process were numerically modelled and analysed in realistic numerical simulation to verify the defined project functional plan. The numerical model has taken into consideration large displacement mechanic and contact problem of elastic body in collision with rigid sea bottom. On the basis of the proofed functional plan a precise organization of the process was defined with a focus on the synchronization of all depending actions.

Ključne riječi
subsea pipeline laying; control bending; large displacement-small deformation; contact problem; finite element method

Hrčak ID: 186493

URI
https://hrcak.srce.hr/186493

Posjeta: 805 *