hrcak mascot   Srce   HID

Pregledni rad
https://doi.org/10.17559/TV-20170319011033

Study on green ecological assessment of high-speed railway using unascertained measure and AHP

Yongzhi Chang ; Institute of Geographic Sciences and Natural Resources Research the Chinese Academy of Sciences, Jia 11#, Datun Road, Chaoyang District, Beijing 100101, China
Suocheng Dong ; Institute of Geographic Sciences and Natural Resources Research the Chinese Academy of Sciences, Jia 11#, Datun Road, Chaoyang District, Beijing 100101, China

Puni tekst: engleski, pdf (2 MB) str. 1579-1589 preuzimanja: 124* citiraj
APA 6th Edition
Chang, Y. i Dong, S. (2017). Study on green ecological assessment of high-speed railway using unascertained measure and AHP. Tehnički vjesnik, 24 (5), 1579-1589. https://doi.org/10.17559/TV-20170319011033
MLA 8th Edition
Chang, Yongzhi i Suocheng Dong. "Study on green ecological assessment of high-speed railway using unascertained measure and AHP." Tehnički vjesnik, vol. 24, br. 5, 2017, str. 1579-1589. https://doi.org/10.17559/TV-20170319011033. Citirano 06.12.2019.
Chicago 17th Edition
Chang, Yongzhi i Suocheng Dong. "Study on green ecological assessment of high-speed railway using unascertained measure and AHP." Tehnički vjesnik 24, br. 5 (2017): 1579-1589. https://doi.org/10.17559/TV-20170319011033
Harvard
Chang, Y., i Dong, S. (2017). 'Study on green ecological assessment of high-speed railway using unascertained measure and AHP', Tehnički vjesnik, 24(5), str. 1579-1589. https://doi.org/10.17559/TV-20170319011033
Vancouver
Chang Y, Dong S. Study on green ecological assessment of high-speed railway using unascertained measure and AHP. Tehnički vjesnik [Internet]. 2017 [pristupljeno 06.12.2019.];24(5):1579-1589. https://doi.org/10.17559/TV-20170319011033
IEEE
Y. Chang i S. Dong, "Study on green ecological assessment of high-speed railway using unascertained measure and AHP", Tehnički vjesnik, vol.24, br. 5, str. 1579-1589, 2017. [Online]. https://doi.org/10.17559/TV-20170319011033
Puni tekst: hrvatski, pdf (2 MB) str. 1579-1589 preuzimanja: 142* citiraj
APA 6th Edition
Chang, Y. i Dong, S. (2017). Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP. Tehnički vjesnik, 24 (5), 1579-1589. https://doi.org/10.17559/TV-20170319011033
MLA 8th Edition
Chang, Yongzhi i Suocheng Dong. "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP." Tehnički vjesnik, vol. 24, br. 5, 2017, str. 1579-1589. https://doi.org/10.17559/TV-20170319011033. Citirano 06.12.2019.
Chicago 17th Edition
Chang, Yongzhi i Suocheng Dong. "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP." Tehnički vjesnik 24, br. 5 (2017): 1579-1589. https://doi.org/10.17559/TV-20170319011033
Harvard
Chang, Y., i Dong, S. (2017). 'Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP', Tehnički vjesnik, 24(5), str. 1579-1589. https://doi.org/10.17559/TV-20170319011033
Vancouver
Chang Y, Dong S. Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP. Tehnički vjesnik [Internet]. 2017 [pristupljeno 06.12.2019.];24(5):1579-1589. https://doi.org/10.17559/TV-20170319011033
IEEE
Y. Chang i S. Dong, "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP", Tehnički vjesnik, vol.24, br. 5, str. 1579-1589, 2017. [Online]. https://doi.org/10.17559/TV-20170319011033

Sažetak
Aiming at exploring the ecological effect of high-speed railway construction and operation, this paper establishes a green ecological assessment index system based on the concept of sustainable development, and sets up a green ecological assessment model based on unascertained measure and AHP. During the assessment process, the author firstly constructs the unascertained judgment matrix by introducing the unascertained theory, secondly determines index classification weight by AHP, and thirdly identifies the green grade according to the confidence criterion. On this basis, the author defines the green assessment grades. Then, the author carries out green ecological assessment of Beijing-Shanghai HighSpeed Railway (Xuzhou-Shanghai Section). The ecological score is 7.0089 and the resulting color is turquoise, which is consistent with the concept of sustainable development. The result shows that it is feasible to combine the unascertained measure and AHP into an ecological assessment method for high-speed railway construction project.

Ključne riječi
AHP; green ecology; high-speed railway construction project; sustainable development; unascertained measure

Hrčak ID: 188256

URI
https://hrcak.srce.hr/188256

[hrvatski]

Posjeta: 416 *