hrcak mascot   Srce   HID

Izvorni znanstveni članak

Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods

Esmaeil Mehdizadeh ; Islamic Azad University, Qazvin Branch
Amir Aydin Atashi Abkenar

Puni tekst: engleski, PDF (851 KB) str. 30-50 preuzimanja: 181* citiraj
APA 6th Edition
Mehdizadeh, E. i Aydin Atashi Abkenar, A. (2018). Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods. Engineering Review, 38 (1), 30-50. Preuzeto s https://hrcak.srce.hr/192864
MLA 8th Edition
Mehdizadeh, Esmaeil i Amir Aydin Atashi Abkenar. "Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods." Engineering Review, vol. 38, br. 1, 2018, str. 30-50. https://hrcak.srce.hr/192864. Citirano 28.03.2020.
Chicago 17th Edition
Mehdizadeh, Esmaeil i Amir Aydin Atashi Abkenar. "Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods." Engineering Review 38, br. 1 (2018): 30-50. https://hrcak.srce.hr/192864
Harvard
Mehdizadeh, E., i Aydin Atashi Abkenar, A. (2018). 'Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods', Engineering Review, 38(1), str. 30-50. Preuzeto s: https://hrcak.srce.hr/192864 (Datum pristupa: 28.03.2020.)
Vancouver
Mehdizadeh E, Aydin Atashi Abkenar A. Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods. Engineering Review [Internet]. 2018 [pristupljeno 28.03.2020.];38(1):30-50. Dostupno na: https://hrcak.srce.hr/192864
IEEE
E. Mehdizadeh i A. Aydin Atashi Abkenar, "Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods", Engineering Review, vol.38, br. 1, str. 30-50, 2018. [Online]. Dostupno na: https://hrcak.srce.hr/192864. [Citirano: 28.03.2020.]

Sažetak
This paper develops two mixed integer linear
programming (MILP) models for an integrated
aggregate production planning (APP) system with
return products, breakdowns and preventive
maintenance (PM). The goal is to minimize the cost
of production with regard to PM costs,
breakdowns, the number of laborers and inventory
levels and downtimes. Due to NP-hard class of
APP, we implement a harmony search (HS)
algorithm and vibration damping optimization
(VDO) algorithm for solving these models. Next,
the Taguchi method is conducted to calibrate the
parameter of the metaheuristics and select the
optimal levels of factors influencing the
algorithm’s performance. Computational results
tested on a set of randomly generated instances
show the efficiency of the vibration damping
optimization algorithm against the harmony search
algorithm. We find VDO algorithm to obtain best
quality solutions for APP with breakdowns and
PM, which could be efficient for large scale
problems. Finally, the computational results show
that the objective function values obtained by APP
with PM are better than APP with breakdown
results.

Ključne riječi
aggregate production planning; breakdown; preventive maintenance; vibration damping optimization; harmony search algorithm

Hrčak ID: 192864

URI
https://hrcak.srce.hr/192864

Posjeta: 260 *