hrcak mascot   Srce   HID

Izvorni znanstveni članak

Validation of EOPs/FRGs Procedures Using LOHS Scenario

Damir Konjarek ; Enconet d.o.o. Miramarska 20, 10000 Zagreb, Croatia
Josip Vuković ; Enconet d.o.o. Miramarska 20, 10000 Zagreb, Croatia
Tomislav Bajs ; Enconet d.o.o. Miramarska 20, 10000 Zagreb, Croatia

Puni tekst: engleski, pdf (2 MB) str. 0-0 preuzimanja: 38* citiraj
APA 6th Edition
Konjarek, D., Vuković, J. i Bajs, T. (2013). Validation of EOPs/FRGs Procedures Using LOHS Scenario. Journal of Energy, 62 (1-4), 0-0. Preuzeto s https://hrcak.srce.hr/199053
MLA 8th Edition
Konjarek, Damir, et al. "Validation of EOPs/FRGs Procedures Using LOHS Scenario." Journal of Energy, vol. 62, br. 1-4, 2013, str. 0-0. https://hrcak.srce.hr/199053. Citirano 28.05.2020.
Chicago 17th Edition
Konjarek, Damir, Josip Vuković i Tomislav Bajs. "Validation of EOPs/FRGs Procedures Using LOHS Scenario." Journal of Energy 62, br. 1-4 (2013): 0-0. https://hrcak.srce.hr/199053
Harvard
Konjarek, D., Vuković, J., i Bajs, T. (2013). 'Validation of EOPs/FRGs Procedures Using LOHS Scenario', Journal of Energy, 62(1-4), str. 0-0. Preuzeto s: https://hrcak.srce.hr/199053 (Datum pristupa: 28.05.2020.)
Vancouver
Konjarek D, Vuković J, Bajs T. Validation of EOPs/FRGs Procedures Using LOHS Scenario. Journal of Energy [Internet]. 2013 [pristupljeno 28.05.2020.];62(1-4):0-0. Dostupno na: https://hrcak.srce.hr/199053
IEEE
D. Konjarek, J. Vuković i T. Bajs, "Validation of EOPs/FRGs Procedures Using LOHS Scenario", Journal of Energy, vol.62, br. 1-4, str. 0-0, 2013. [Online]. Dostupno na: https://hrcak.srce.hr/199053. [Citirano: 28.05.2020.]

Sažetak
Validation of EOPs (Emergency Operating Procedures) and FRGs (Function Restoration
Guidelines) can be achieved either through plant full scope simulator or on desk top exercises. The
desk top exercise is conducted when for the given scenario plant full scope simulator is not suitable.
In either verification cases predefined scenario should be evaluated and possible branching
foreseen. The scenario presented is LOHS, with bleed and feed procedure initiated. Best estimate
light water reactor transient analysis code RELAP5/mod3.3 was used in calculation. Standardized
detailed plant model was used. Operator actions were modelled from beginning of the scenario to its
termination.

Hrčak ID: 199053

URI
https://hrcak.srce.hr/199053

Posjeta: 61 *