APA 6th Edition Huzjan, B. i Šošić, D. (2019). Project management during construction of the cross-border Svilaj Bridge. Građevinar, 71 (09.), 781-790. https://doi.org/10.14256/JCE.2604.2019
MLA 8th Edition Huzjan, Boris i Darko Šošić. "Project management during construction of the cross-border Svilaj Bridge." Građevinar, vol. 71, br. 09., 2019, str. 781-790. https://doi.org/10.14256/JCE.2604.2019. Citirano 06.12.2019.
Chicago 17th Edition Huzjan, Boris i Darko Šošić. "Project management during construction of the cross-border Svilaj Bridge." Građevinar 71, br. 09. (2019): 781-790. https://doi.org/10.14256/JCE.2604.2019
Harvard Huzjan, B., i Šošić, D. (2019). 'Project management during construction of the cross-border Svilaj Bridge', Građevinar, 71(09.), str. 781-790. https://doi.org/10.14256/JCE.2604.2019
Vancouver Huzjan B, Šošić D. Project management during construction of the cross-border Svilaj Bridge. Građevinar [Internet]. 2019 [pristupljeno 06.12.2019.];71(09.):781-790. https://doi.org/10.14256/JCE.2604.2019
IEEE B. Huzjan i D. Šošić, "Project management during construction of the cross-border Svilaj Bridge", Građevinar, vol.71, br. 09., str. 781-790, 2019. [Online]. https://doi.org/10.14256/JCE.2604.2019
APA 6th Edition Huzjan, B. i Šošić, D. (2019). Upravljanje projektom izgradnje međudržavnog mosta Svilaj. Građevinar, 71 (09.), 781-790. https://doi.org/10.14256/JCE.2604.2019
MLA 8th Edition Huzjan, Boris i Darko Šošić. "Upravljanje projektom izgradnje međudržavnog mosta Svilaj." Građevinar, vol. 71, br. 09., 2019, str. 781-790. https://doi.org/10.14256/JCE.2604.2019. Citirano 06.12.2019.
Chicago 17th Edition Huzjan, Boris i Darko Šošić. "Upravljanje projektom izgradnje međudržavnog mosta Svilaj." Građevinar 71, br. 09. (2019): 781-790. https://doi.org/10.14256/JCE.2604.2019
Harvard Huzjan, B., i Šošić, D. (2019). 'Upravljanje projektom izgradnje međudržavnog mosta Svilaj', Građevinar, 71(09.), str. 781-790. https://doi.org/10.14256/JCE.2604.2019
Vancouver Huzjan B, Šošić D. Upravljanje projektom izgradnje međudržavnog mosta Svilaj. Građevinar [Internet]. 2019 [pristupljeno 06.12.2019.];71(09.):781-790. https://doi.org/10.14256/JCE.2604.2019
IEEE B. Huzjan i D. Šošić, "Upravljanje projektom izgradnje međudržavnog mosta Svilaj", Građevinar, vol.71, br. 09., str. 781-790, 2019. [Online]. https://doi.org/10.14256/JCE.2604.2019
Sažetak This paper presents specific project-management features at various stages of the project. The focus is mostly placed on the limitations and differences between regulations and legal frameworks applied in the territories of the Republic of Croatia and Bosnia and Herzegovina. A special emphasis is placed on preconditions to be met for the delivery of building permit and other documents as needed for the start and realisation of works, on the conduct of expert supervision in accordance with technical regulations applied in both countries and the Engineer’s role with regard to realisation of construction contract on behalf of the joint client.