Skoči na glavni sadržaj

Stručni rad

Rječina bridge on the southern pavement of the Rijeka Bypass UDK 624.6.001.7:69.009.182

Zlatko Šavor
Igor Gukov
Jelena Bleiziffer
Gordna Hrelja
Ivan Kalafatić
Marin Franetović


Puni tekst: hrvatski pdf 895 Kb

str. 893-900

preuzimanja: 2.493

citiraj


Sažetak

A new bridge is currently under construction on the south pavement of the Rijeka Bypass, next to the existing bridge built in 1984. The design documentation for both bridges was prepared already in 1970s, but the construction of the southern pavement was postponed. In the new design, the initial design requirements have been adjusted to the modern requirements regarding load-bearing capacity in operation. The increased traffic and seismic actions call for an increase in the size of cross sections, which in turn results in greater consumption of materials when compared to the initial design.

Ključne riječi

Rijeka bypass; Rječina bridge; southern pavement; new design; traffic action; seismic action; increase in size

Hrčak ID:

42900

URI

https://hrcak.srce.hr/42900

Datum izdavanja:

12.10.2009.

Podaci na drugim jezicima: hrvatski

Posjeta: 3.613 *