hrcak mascot   Srce   HID

Izvorni znanstveni članak

Contracted price overrun as contracted construction time overrun function

Vahida Žujo   ORCID icon orcid.org/0000-0003-3380-5828 ; Faculty of Civil Engineering, University "Džemal Bijedić" in Mostar, Sjeverni logor bb, 88000 Mostar, Bosnia and Herzegovina
Diana Car-Pušić ; Faculty of Civil Engineering, University in Rijeka, Viktora Cara Emina 5, 51000 Rijeka, Croatia
Aida Brkan-Vejzović ; Faculty of Business Management, University "Džemal Bijedić" in Mostar, Sjeverni logor bb, 88000 Mostar, Bosnia and Herzegovina

Puni tekst: engleski, pdf (137 KB) str. 23-29 preuzimanja: 575* citiraj
APA 6th Edition
Žujo, V., Car-Pušić, D. i Brkan-Vejzović, A. (2010). Contracted price overrun as contracted construction time overrun function. Tehnički vjesnik, 17 (1), 23-29. Preuzeto s https://hrcak.srce.hr/50601
MLA 8th Edition
Žujo, Vahida, et al. "Contracted price overrun as contracted construction time overrun function." Tehnički vjesnik, vol. 17, br. 1, 2010, str. 23-29. https://hrcak.srce.hr/50601. Citirano 07.03.2021.
Chicago 17th Edition
Žujo, Vahida, Diana Car-Pušić i Aida Brkan-Vejzović. "Contracted price overrun as contracted construction time overrun function." Tehnički vjesnik 17, br. 1 (2010): 23-29. https://hrcak.srce.hr/50601
Harvard
Žujo, V., Car-Pušić, D., i Brkan-Vejzović, A. (2010). 'Contracted price overrun as contracted construction time overrun function', Tehnički vjesnik, 17(1), str. 23-29. Preuzeto s: https://hrcak.srce.hr/50601 (Datum pristupa: 07.03.2021.)
Vancouver
Žujo V, Car-Pušić D, Brkan-Vejzović A. Contracted price overrun as contracted construction time overrun function. Tehnički vjesnik [Internet]. 2010 [pristupljeno 07.03.2021.];17(1):23-29. Dostupno na: https://hrcak.srce.hr/50601
IEEE
V. Žujo, D. Car-Pušić i A. Brkan-Vejzović, "Contracted price overrun as contracted construction time overrun function", Tehnički vjesnik, vol.17, br. 1, str. 23-29, 2010. [Online]. Dostupno na: https://hrcak.srce.hr/50601. [Citirano: 07.03.2021.]

Sažetak
By establishing the model for the quick estimation of the construction time in contracted price function and the construction time overrun model in risk factor function, a logical question arises what effect this has on the contracted price when applying such models in practice. This paper analyses the procedure for establishing a model for building construction structures – new construction. This model expresses the contracted price overrun in relation to the construction time overrun caused by risk factors. The model is in the form of exponential equation whose basic advantage is its form of a natural logarithm. The logarithm transformation enables the use of a single linear regression for determining the model parameters. It is appropriate for the early planning stage under the conditions when there is a real possibility of risk factor occurrence. Due to economic differences, its application is recommended for regions where the research was conducted.

Ključne riječi
construction; contracted price; contracted time; overrun function

Hrčak ID: 50601

URI
https://hrcak.srce.hr/50601

[hrvatski]

Posjeta: 1.036 *