hrcak mascot   Srce   HID

Pregledni rad

Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria

Damir Crnković ; HEP-ODS d.o.o. Elektroslavonija Osijek, Šet. K.F. Šepera 1A, 31000 Osijek
Damir Šljivac ; Elektrotehnički fakultet Osijek, Kneza Trpimira 2B, 31000 Osijek
Marinko Stojkov ; Strojarski fakultet Slavonski Brod, Trg Ivane Brlić Mažuranić 2, 35000 Slavonski Brod

Puni tekst: engleski, pdf (465 KB) str. 101-108 preuzimanja: 1.089* citiraj
APA 6th Edition
Crnković, D., Šljivac, D. i Stojkov, M. (2010). Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria. Tehnički vjesnik, 17 (1), 101-108. Preuzeto s https://hrcak.srce.hr/50615
MLA 8th Edition
Crnković, Damir, et al. "Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria." Tehnički vjesnik, vol. 17, br. 1, 2010, str. 101-108. https://hrcak.srce.hr/50615. Citirano 27.02.2021.
Chicago 17th Edition
Crnković, Damir, Damir Šljivac i Marinko Stojkov. "Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria." Tehnički vjesnik 17, br. 1 (2010): 101-108. https://hrcak.srce.hr/50615
Harvard
Crnković, D., Šljivac, D., i Stojkov, M. (2010). 'Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria', Tehnički vjesnik, 17(1), str. 101-108. Preuzeto s: https://hrcak.srce.hr/50615 (Datum pristupa: 27.02.2021.)
Vancouver
Crnković D, Šljivac D, Stojkov M. Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria. Tehnički vjesnik [Internet]. 2010 [pristupljeno 27.02.2021.];17(1):101-108. Dostupno na: https://hrcak.srce.hr/50615
IEEE
D. Crnković, D. Šljivac i M. Stojkov, "Influence of wind power plants on power system operation – Part one: Wind power plant operation and network connection criteria", Tehnički vjesnik, vol.17, br. 1, str. 101-108, 2010. [Online]. Dostupno na: https://hrcak.srce.hr/50615. [Citirano: 27.02.2021.]

Sažetak
For the purpose of a comprehensive review of power system operation with the connection of wind power plants, this review is presented in two articles. The first article presents the main concepts of wind power plants, technical possibilities of wind power plant operation and all requested criteria for connecting the wind power plant to the power system. In the second article the power quality after connecting wind power plant to the distribution network, energy losses in distribution network with connected wind power plant and feasibility and development of electrical energy production with wind power plants in the power system of the Republic Croatia are considered.

Ključne riječi
connection criteria; distribution network losses; power quality; power system; wind power plant

Hrčak ID: 50615

URI
https://hrcak.srce.hr/50615

[hrvatski]

Posjeta: 1.881 *