hrcak mascot   Srce   HID

Prethodno priopćenje

A contribution to the determination of criteria and measures for evaluating operational planning and production control

Borislav Gordić ; Draškovićeva 57, 10000 Zagreb, Hrvatska

Puni tekst: engleski, pdf (101 KB) str. 109-115 preuzimanja: 340* citiraj
APA 6th Edition
Gordić, B. (2011). A contribution to the determination of criteria and measures for evaluating operational planning and production control. Tehnički vjesnik, 18 (1), 109-115. Preuzeto s https://hrcak.srce.hr/65935
MLA 8th Edition
Gordić, Borislav. "A contribution to the determination of criteria and measures for evaluating operational planning and production control." Tehnički vjesnik, vol. 18, br. 1, 2011, str. 109-115. https://hrcak.srce.hr/65935. Citirano 21.02.2020.
Chicago 17th Edition
Gordić, Borislav. "A contribution to the determination of criteria and measures for evaluating operational planning and production control." Tehnički vjesnik 18, br. 1 (2011): 109-115. https://hrcak.srce.hr/65935
Harvard
Gordić, B. (2011). 'A contribution to the determination of criteria and measures for evaluating operational planning and production control', Tehnički vjesnik, 18(1), str. 109-115. Preuzeto s: https://hrcak.srce.hr/65935 (Datum pristupa: 21.02.2020.)
Vancouver
Gordić B. A contribution to the determination of criteria and measures for evaluating operational planning and production control. Tehnički vjesnik [Internet]. 2011 [pristupljeno 21.02.2020.];18(1):109-115. Dostupno na: https://hrcak.srce.hr/65935
IEEE
B. Gordić, "A contribution to the determination of criteria and measures for evaluating operational planning and production control", Tehnički vjesnik, vol.18, br. 1, str. 109-115, 2011. [Online]. Dostupno na: https://hrcak.srce.hr/65935. [Citirano: 21.02.2020.]

Sažetak
For the operational planning and production control domain criteria and measures are suggested according to which the successfulness of operational planning and production control can be evaluated and that process assessed in relation to others and a certain reference system by virtue of an adequate coefficient. Three criteria and measures for evaluating operational planning and production control are given and analysed, as well as a synthetic criterion for a consolidated evaluation. The example from the undertaken research in one production system shows the evaluation of operational planning and production control, and by means of an adequate model, an estimate is made of the possibility for the improvement of that process by using the available resources, without making any investments.

Ključne riječi
meeting the deadlines; operational planning sensitivity; stock management efficiency; successfulness of the operational planning and production control

Hrčak ID: 65935

URI
https://hrcak.srce.hr/65935

[hrvatski]

Posjeta: 668 *