hrcak mascot   Srce   HID

Datum izdavanja: prosinca 2015.

Objavljen na Hrčku: 14. 12. 2015.
Sadržaj Puni tekst
The determination of the market value of works in progress with probability graphs (str.1271-1279) engleskipdf 169 KB
Istvan Hajnal
Izvorni znanstveni članak
 
Fresh Ready-Mixed Concrete Waste in Construction Projects: A Planning Approach (str.1280-1288) engleskipdf 151 KB
A. Kazaz, Serdar Ulubeyli, Bayram Er, Volkan Arslan, Murat Atici, Ahmet Arslan
Izvorni znanstveni članak
 
Impact of Real-time Project Control on Capital Project Cost and Schedule Performance (str.1289-1294) engleskipdf 135 KB
David Grau, Amin Abbaszadegan
Izvorni znanstveni članak
 
Ranking Projects in Multi-Criteria Environment (str.1295-1301) engleskipdf 131 KB
Zoltan Sebestyen, Tamas Toth
Izvorni znanstveni članak
 
History and Some Latest Developments of Precedence Diagramming Method (str.1302-1314) engleskipdf 450 KB
Miklos Hajdu
Izvorni znanstveni članak
 
Comparison and Renaissance of Classic Line-of-Balance and Linear Schedule Concepts for Construction Industry (str.1315-1329) engleskipdf 341 KB
Yi Su, Gunnar Lucko
Izvorni znanstveni članak
 
A Comparative Study of Owner, Contractor, and Consultant Perspective on the Selection Criteria for Subcontractors. (str.1330-1341) engleskipdf 266 KB
Farnaz Sadeghpour, Shabtal Isaac, Santiago Díez Torrijos, Antonio Ramón Albert, Benjamín Benlloch Miralles, Ricardo Ayala López, José Agustín Lillo Arnalte, Luis Tena Gil
Izvorni znanstveni članak
 
Posjeta: 13.409 *