THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE
Abstract
The critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems.
The activities underwent crashing of both the time and cost using linear programming. A simplified representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased.
Keywords: Critical path method, linear programming, time crashing, maintenance
Downloads
Published
How to Cite
Issue
Section
License
Upon acceptance of an article for publication in Ekonomski Vjesnik / Econviews – Review of Contemporary Entrepreneurship, Business, and Economic Issues, contributing authors automatically waive their copyright in favour of the journal. The journal reserves copyright of all papers published in it.