[1]
Gholamnejad, J., Azimi, A., Lotfian, R., Kasmaeeyazdi, S. and Tinti, F. 2020. The application of a stockpile stochastic model into long-term open pit mine production scheduling to improve the feed grade for the processing plant. Rudarsko-geološko-naftni zbornik. 35, 4 (Oct. 2020). DOI:https://doi.org/10.17794/rgn.2020.4.10.