1.
Gholamnejad J, Azimi A, Lotfian R, Kasmaeeyazdi S, Tinti F. The application of a stockpile stochastic model into long-term open pit mine production scheduling to improve the feed grade for the processing plant. Rud.-geol.-naft. zb. [Internet]. 2020Oct.8 [cited 2024Apr.23];35(4). Available from: https://hrcak.srce.hr/ojs/index.php/rgn/article/view/11887