[1]
Radoš, B. and Radoš, A. 2017. Risk Evaluation of Production and Implementation of The Project. Vallis Aurea. 3, 2 (Dec. 2017), 29–41. DOI:https://doi.org/10.2507/IJVA.3.2.3.36.