Plinovod DN 200 Kozarac – Stružec sagrađen je 1970. godine od bešavnih čeličnih cijevi API 5L Grade B. Namjena mu je bila za transport prirodnog plina do mjerno-redukcijske (MRS) stanice Stružec (opskrba prirodnim plinom za selo Stružec) te do mjerno-redukcijske stanice Stružec-kompresorska stanica (MRS KS). U početku plinovod je bio u vlasništvu tvrtke INA d.d. no nakon 2001. godine, osnivanjem tvrtke Plinacro d.o.o. za transport prirodnog plina, plinovod prelazi u vlasništvo spomenute tvrtke. Uzimajući u obzir starost plinovoda, način njegove izgradnje, lokaciju te činjenicu da je plinovodom sve teže ostvarivati siguran i pouzdan transport prirodnog plina potrebno je bilo ili izgraditi novi plinovod ili obaviti rekonstrukciju/revitalizaciju postojećeg. S obzirom da je izgradnja kao i rekonstrukcija postupak koji traje dulji vremenski period te uzimajući u obzir i financijski status samoga projekta, Plinacro je odlučio obaviti revitalizaciju plinovoda s fleksibilnim cijevima. Fleksibilna cijev je karakterizirana kao cijev koja je napravljena od više različitih slojeva koji omogućuju njezinu savitljivost kao i čvrstoću. Osnovne prednosti su jednostavna i brza ugradnja, mali troškovi u odnosu na čeličnu cijev, odlična antikorozivna svojstva te duži životni vijek uz minimalno održavanje. Glavni projekt za revitalizaciju plinovoda DN 200 Kozarac-Stružec bio je gotov u ljeto 2017. godine. Nakon pregleda i procesa javne nabave, a i zbog početka ogrjevne sezone 2017./2018., radovi na revitalizaciji predviđeni su za kolovoz i rujan 2018. Ovim načinom revitalizacije plinovoda, Plinacro postaje jedan od prvih operatera transportnog sustava u Europi koji fleksibilne cijevi upotrebljava za transport prirodnog plina.
The gas pipeline Kozarac - Struzec DN 200 was constructed in 1970 of seamless pipes in accordance with API 5L Grade B. The gas pipeline was constructed by the INA plc. Company, as the investor, and was used for the delivery of natural gas for the metering - reduction station Struzec (distribution for village Struzec) and for the compressor station Struzec (fuel gas for compressor drivers). After unbundling of Natural Gas Division from the INA plc. Company in 2001, the gas pipeline Kozarac - Struzec DN 200 is in the possession of the newly established company for transmission of natural gas, PLINACRO Ltd., Croatian transmission system operator. Considering the age of the gas pipeline, its location and the necessity to provide safe and reliable gas transmission, it was necessary to either construct a new pipeline or to make a reconstruction/revitalization of the existing one. Since the pipeline construction is considerably more expensive and it requires more time (licence obtaining, public procurement…) Plinacro decided to conduct a revitalization of the gas pipeline with a flexible pipe considering the length of the gas pipeline and the fact that the pipeline is unpiggable so the condition of the wall thickness was unknown. Flexible pipe is characterized by a composite construction of layers of different materials, which allows bending without adverse effects on the pipe. The main advantages are fast, easy and inexpensive installation, excellent corrosion resistance, longer life with minimum maintenance, minimum number of field joints… A detailed project for the revitalization of the gas pipeline Kozarac – Struzec with the flexible pipes was done in summer 2017 and the revitalization will start in august/september 2018.
Tvrtka Plinacro d.o.o. kao operator transportnog sustava Republike Hrvatska sigurno i pouzdano upravlja i održava 2.693 kilometara čeličnih cjevovoda i to: ■ 952 km plinovoda maksimalnog radnog tlaka 75 bara, promjera od DN 200 do DN 800 mm i ■ 1.741 km plinovoda maksimalnog radnog tlaka 50 bara, promjera od DN 80 do DN 500 Plinovod DN 200 Kozarac – Stružec sagrađen je 1970. godine od bešavnih čeličnih cijevi API 5L Grade B. Nalazi se između dva grada, Popovače i Siska u Sisačko-moslavačkoj županiji. Plinovod je ukupne dužine 6.041 metar te prvenstveno služi za transport prirodnog plina sa plinskog čvora (PČ) Kozarac do kompresorske stanice Stružec u vlasništvu tvrtke INA d.d. Na plinovodu nema blokadnih stanica, katodno je štićen te je građen bez mogućnosti čišćenja i pametnog (IN-LINE) ispitivanja. U proteklih 10 godina, plinovod je popravljan šest puta, uglavnom zbog korozijskih oštećenja. Sama trasa plinovoda prolazi kroz naftno polje Stružec gdje se križa sa velikim brojem cjevovoda tvrtke INA d.d. Uzeći u obzir sve navedene informacije te prvenstveno zbog nužne potrebe za sigurnim i pouzdanim transportom prirodnog plina, odluka o gradnji novog plinovoda ili revitalizaciji postojećeg morala je biti donešena. Kako bi dobili sve potrebne informacije prije donošenja konačne investicijske odluke, Plinacro je odlučio obaviti dodatna ispitivanja na plinovodu kako bi prikupili što više informacija o stanju plinovoda.