Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
Abstract
Awareness of the importance of U-shaped assembly line balancing problems is all on the rise. In the U-shaped assembly line, balancing is affected by the uncertainty associated with the assembly task times. Therefore, it is crucial to develop an approach to respond to the uncertainty caused by the task times. When the great majority of existing literature related to uncertainty in the assembly line is considered, it is observed that the U-shaped assembly line balancing problem under uncertainty is scarcely investigated. That being the case, we aim to fill this research gap by proposing a robust counterpart formulation for the addressed problem. In this study, a robust optimization model is developed for the U-shaped assembly line worker assignment and balancing problem (UALWABP) to cope with the task time uncertainty characterized by a combined interval and polyhedral uncertainty set. A real case study is conducted through data from a company producing water meters.
Downloads
Published
Issue
Section
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).