Skoči na glavni sadržaj

Prethodno priopćenje

Evaluation of benefits resulting from innovation of input raw materials dosing process in sintering

P. Besta ; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
A. Samolejová ; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
K. Janovská ; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
M. Lampa ; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
R. Lenort ; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic


Puni tekst: engleski pdf 691 Kb

str. 457-460

preuzimanja: 616

citiraj


Sažetak

Production of blast furnace sinter is among the processes with the highest energy and material requirements. Fuel consumption is especially significant cost item here. The presence of grate sintered in charge, i.e. return sinter from 12 to 22 mm in size, can have fundamental impact on the technical and economic indicators of the sintering process. Grate sinter can be used as a foundation layer under the sintering mixture, to increase air permeability of charge and to improve the gas-dynamic conditions. The article analyzes the impact of grate sinter on the sintering process, based on an analysis of the acquired production indicators within the scope of the research in question.

Ključne riječi

sintering process; iron; iron ore; costs

Hrčak ID:

82905

URI

https://hrcak.srce.hr/82905

Datum izdavanja:

1.10.2012.

Podaci na drugim jezicima: hrvatski

Posjeta: 1.265 *