Skip to the main content

Preliminary communication

Design and testing of 25 kV AC electric railway power supply systems

Milivoj Mandić orcid id orcid.org/0000-0002-9790-1803 ; University of Zagreb, Faculty of Electrical Engineering and Computing, Department of Power Systems, Unska 3, 10000 Zagreb, Croatia
Ivo Uglešić ; University of Zagreb, Faculty of Electrical Engineering and Computing, Department of Power Systems, Unska 3, 10000 Zagreb, Croatia
Viktor Milardić orcid id orcid.org/0000-0001-7230-3500 ; University of Zagreb, Faculty of Electrical Engineering and Computing, Department of Power Systems, Unska 3, 10000 Zagreb, Croatia


Full text: croatian pdf 1.843 Kb

page 505-509

downloads: 599

cite

Full text: english pdf 1.843 Kb

page 505-509

downloads: 12.710

cite


Abstract

The paper describes the procedures implemented in the design and testing of the newly built traction substation, which is foreseen for the power supply of part of the electrical tracks in the area of Zagreb. The power capacity of the new traction transformer substation was determined according to the load flow calculation that was carried out for the period of maximal traffic time-table. During the period of test operation a number of measurements were conducted in order to testify technical performances of the substation, as well as to verify its impacts on the environment. Measurements of the power quality in the utility power network, which supplies the traction system, were conducted. Also, measurements of electrical and magnetic fields inside the traction substation and in its vicinity were undertaken.

Keywords

AC electrified railway system; design and testing; simulation and measurement results analysis; traction substation

Hrčak ID:

104078

URI

https://hrcak.srce.hr/104078

Publication date:

15.6.2013.

Article data in other languages: croatian

Visits: 14.791 *