The Potential of a Hybrid Power Plant for the Dubrovnik - Neretva County (Southern Croatia)

Huili Zhang ; Department of Chemical Engineering, Chemical and Biochemical Process Technology and Control Section, KU Leuven, Heverlee, Belgium
Jan Baeyens ; College of Life Science and Technology, Beijing University of Chemical Technology, Beijing, China
Jan Degreve ; KU Leuven, Heverlee, Belgium


Puni tekst: engleski pdf 578 Kb

str. 174-182

preuzimanja: 529

citiraj


Sažetak

The Croatian electricity demand exceeds domestic production and about 30% of additional power is covered from imports. The Croatian government is planning to add domestic production capacity, using natural gas and coal as the main fuel. Due to the attractive solar irradiation in Croatia, these new projects offer the possibility to build these thermal power plants as hybrid plants by adding solar energy within the production. The present paper will investigate the potential of solar energy in the Southern Croatian region and its possible contribution in a hybrid set-up. The paper assesses the required input data and presents a hybrid Concentrated Solar Power (CSP) design. The results demonstrate the potential of adding a CSP in a hybrid power plant in Southern Croatia.

Ključne riječi

Croatia; Concentrated solar power; Design; Hourly direct irradiation; Plant simulation