Skoči na glavni sadržaj

Izvorni znanstveni članak

Completing the globally interconnected electricity grid

Steve Aubertin


Puni tekst: engleski pdf 702 Kb

str. 34-37

preuzimanja: 196

citiraj


Sažetak

The total global load at the present moment in time is between 23,000 GWh to 24,000 GWh and this will probably increase by a factor of three by 2050. The Global Energy Interconnection Development and Cooperation Organisation – GEIDCO is promoting "Global Energy Interconnection which is "Smart Grid + UHV Grid + Clean Energy"; it is an infrastructure platform on which clean energy can be developed, transmitted and used massively worldwide. The total bill is estimated by GEIDCO at US$ 50,000,000,000,000 over the rollout programme of up to 30 years, which equates to nearly US$ 1.7 trillion each year at today's prices – a figure equal to the combined GDP of the top 10 countries in 2016, or nearly 70 % of the global total.

Ključne riječi

Global Energy Interconnection; GEI; capacity; world; transformer market

Hrčak ID:

202535

URI

https://hrcak.srce.hr/202535

Datum izdavanja:

9.4.2018.

Posjeta: 557 *