Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.37798/202069230

PEAK PLANT MODELS IN THE ELECTRIC POWER SYSTEM MODEL OF RELIABILITY AND AVAILABILITY

Mićo Klepo orcid id orcid.org/0000-0002-8330-8689 ; Croatian Energy Regulatory Agency, Ul. grada Vukovara 14. 10 000 Zagreb
Vladimir Mikuličić ; Faculty of Electrical Engineering and Computer Science, Unska 3. 10 000 Zagreb
Zdenko Šimić orcid id orcid.org/0000-0001-7514-8227 ; Faculty of Electrical Engineering, Computer Science and Information Technology Osijek, Kneza Trpimira 2B. 31000 Osijek


Puni tekst: engleski pdf 1.531 Kb

preuzimanja: 377

citiraj


Sažetak

The work sets out the results of the theory/methodological refinement of models whereby peak generating plants are included in the reliability and
availability patterns of electricity systems while operational planning operations are taking place. Account shall be taken of the technical and energy
characteristics of such generating units, as well as of the specific conditions and requirements imposed on such generating units, resulting from their
location and the role in covering peak loads and consumption of the electricity system.

Ključne riječi

Peak plant model, plant failure during operation, plant failure during start-up, postponable outage, power system availability and reliability

Hrčak ID:

247122

URI

https://hrcak.srce.hr/247122

Datum izdavanja:

18.6.2020.

Posjeta: 949 *