Metalurgija, Vol. 64 No. 1-2, 2025.
Prethodno priopćenje
The feasibility study for the establishment of a wind power plant
Zh. Romazanov
orcid.org/0000-0002-9790-2021
; Department of Economics and Business, Karaganda Industrial University, Temirtau, Republic of Kazakhstan
*
A. Aldabayeva
; Department of Economics and Business, Karaganda Industrial University, Temirtau, Republic of Kazakhstan
O. Silayeva
; Department of Economics and Business, Karaganda Industrial University, Temirtau, Republic of Kazakhstan
G. Turgumbayeva
orcid.org/0000-0003-3848-3186
; Department of Economics and Business, Karaganda Industrial University, Temirtau, Republic of Kazakhstan
L. Chepelyan
; Department of Economics and Business, Karaganda Industrial University, Temirtau, Republic of Kazakhstan
* Dopisni autor.
Sažetak
The article studies the issues of the application of Renewable Energy Source (RES) technologies for power generation on the basis of wind re sources of Kazakhstan. The primary objective of this study is to evaluate the technical and economic viability of establishing wind power plants for electricity production. Throughout the research process, we computed the production program based on the region’s wind resources and developed a financial model to assess the project’s feasibility. Our findings affirm the effectiveness of RES, particularly wind energy technologies, in Kazakhstan. We determined that the project becomes economically viable when the selling price without VAT exceeds 24,53 tenge per kWh. Thus, the project itself can be recommended for implementation when the price exceeds the threshold level.
Ključne riječi
wind; power; RES; investments; financial modeling
Hrčak ID:
319874
URI
Datum izdavanja:
1.1.2025.
Posjeta: 265 *