Građevinar, Vol. 62 No. 04., 2010.
Stručni rad
Cost structure of construction work on building projects
Neven Martinec
; Institut IGH dd
Nevena Hrnjak Ajduković
; Institut IGH dd
Stjepan Bezak
; Građevinski fakultet Zagreb
Sažetak
The cost structure of construction work undertaken during realization of building projects is analyzed. A special emphasis is placed on model selection, i.e. on the selection of a proper cost estimation method. The model based on the cost estimate of work is used. The structure of work is described for selected buildings situated in the centre of Zagreb. This structure can be used to estimate either the cost of the entire project, or the cost of individual parts of the project. The comparison of cost structures is presented for selected office-residential buildings.
Ključne riječi
construction works; building construction; costs; cost structure; cost estimation model; cost estimate; cost comparison
Hrčak ID:
52074
URI
Datum izdavanja:
29.4.2010.
Posjeta: 13.441 *