Skoči na glavni sadržaj

Stručni rad

Cost structure of construction work on building projects

Neven Martinec ; Institut IGH dd
Nevena Hrnjak Ajduković ; Institut IGH dd
Stjepan Bezak ; Građevinski fakultet Zagreb


Puni tekst: hrvatski pdf 250 Kb

str. 307-311

preuzimanja: 11.283

citiraj


Sažetak

The cost structure of construction work undertaken during realization of building projects is analyzed. A special emphasis is placed on model selection, i.e. on the selection of a proper cost estimation method. The model based on the cost estimate of work is used. The structure of work is described for selected buildings situated in the centre of Zagreb. This structure can be used to estimate either the cost of the entire project, or the cost of individual parts of the project. The comparison of cost structures is presented for selected office-residential buildings.

Ključne riječi

construction works; building construction; costs; cost structure; cost estimation model; cost estimate; cost comparison

Hrčak ID:

52074

URI

https://hrcak.srce.hr/52074

Datum izdavanja:

29.4.2010.

Podaci na drugim jezicima: hrvatski

Posjeta: 13.441 *