Skip to the main content

Professional paper

Modernisation of Učka Tunnel

Gordana Tomašević


Full text: croatian pdf 719 Kb

page 813-822

downloads: 3.602

cite


Abstract

The history of Učka Tunnel, from the first ideas about its realization, to the final construction and long period of use, is described in the paper. It is emphasized that it had been for many years, in fact until recently, the longest tunnel in Croatia. Technical elements of Učka Tunnel are presented, and measures taken to meet EU requirements specified in Directive 2004/54/EC are described in full detail. A particular emphasis is placed on activities undertaken by the concessionary Bina-Istra to modernise this significant transport facility.

Keywords

Učka Tunnel; construction; use; technical elements; modernisation; concessionary Bina-Istra; Directive 2004/54/EC

Hrčak ID:

59617

URI

https://hrcak.srce.hr/59617

Publication date:

4.10.2010.

Article data in other languages: croatian

Visits: 4.914 *