Review article

Optimization of the Pasman island crossing

Jure Radić
Zlatko Šavor
Goran Puž


Full text: croatian pdf 616 Kb

page 65-78

downloads: 2.513

cite


Abstract

Former studies of the future link with the Pasman island, and three alternatives of the new preliminary design of this bridge, are presented. New solutions are analyzed through comparison with some significant sea crossings already realized in other European countries. The described preliminary designs differ according to the type of structure and the size of principal spans, but all of them coincide in the use of concrete as a dominant construction material. The authors point to the remaining open questions, namely to those relating to the required safe overhead clearance.

Keywords

Pasman island; crossing; optimization; preliminary design; type of structure; safe overhead clearance

Hrčak ID:

11378

URI

https://hrcak.srce.hr/11378

Publication date:

18.3.2002.

Article data in other languages: croatian

Visits: 3.559 *