Skip to the main content

Professional paper

Acceptability of subway construction in Zagreb

Davorin Kolić
Vjekoslav Kolić


Full text: croatian pdf 784 Kb

page 563-571

downloads: 6.627

cite


Abstract

Authors start by asserting that first ideas about subway construction were formulated 25 years ago and that arguments in relation to this project have remained unchanged to this day. Technical solutions for underground structures are described, and a particular emphasis is placed on the most sensitive portion of the project: the Sava river crossing. In that respect, the solution involving bridge construction is suggested. Financial aspects of the overall undertaking are analyzed taking into account solutions applied in other countries, particularly those used in the city of Munich. It is emphasized that the price will greatly be influenced by the domestic cost of labor and materials.

Keywords

city of Zagreb; subway; technical factors; economic factors; underground structures; Sava river crossing

Hrčak ID:

12088

URI

https://hrcak.srce.hr/12088

Publication date:

15.10.2001.

Article data in other languages: croatian

Visits: 8.040 *