Skip to the main content

Professional paper

Zagreb steps into the new millennium

Ivan Višić


Full text: croatian pdf 2.259 Kb

page 191-203

downloads: 1.216

cite


Abstract

The need to build the Central Waste Water Treatment Plant (CUPOVZ) in Zagreb is presented and emphasized. The approach to the realization of the overall project is described and basic objectives of the project, with methods to fulfill these objectives, are outlined. A special emphasis is placed on the fact that the structures are functionally harmonized with relevant spatial development plans which, together with the financing scheme, makes the entire project a laudable enterprise. It is the first Croatian project in the sphere of municipal infrastructure development on which the BOT concession model has been applied.

Keywords

CUPOVZ; treatment; wastewater; project preparation; financing; concession; BOT model

Hrčak ID:

12102

URI

https://hrcak.srce.hr/12102

Publication date:

14.5.2001.

Article data in other languages: croatian

Visits: 2.167 *