Skip to the main content

Original scientific paper

AND/OR graphs and project management

Dušan Hvalica ; Faculty of Economics, Ljubljana, Slovenia


Full text: english pdf 2.040 Kb

page 193-197

downloads: 198

cite


Abstract

It is shown that projects can be described by AND/OR graphs and that the cost of the minimal solution subgraph can be defined so as to equal the shortest time for completing a project or the minimal costs of the project represented by the AND/ OR graph.

Keywords

project management; network programming; AND/OR graphs

Hrčak ID:

150260

URI

https://hrcak.srce.hr/150260

Publication date:

30.9.1997.

Visits: 688 *