Skip to the main content

Preliminary communication

https://doi.org/10.17559/TV-20161210095910

Primjena semantičke tehnologije za izračun vremena zavarivanja u razvoju novih proizvoda

Ambrož Stropnik orcid id orcid.org/0000-0002-3565-3795 ; KiviCOM d.o.o., Kidričeva 3a, 2380 Slovenj Gradec, Slovenia
Tomaž Vuherer ; Faculty of Mechanical Engineering, University of Maribor, Smetanova 17, SI-2000, Maribor, Slovenia
Ivan Samardžić ; Mechanical Engineering Faculty in Slavonski Brod, J. J. Strossmayer University of Osijek, Trg Ivane Brlić-Mažuranić 2, 35000 Slavonski Brod, Croatia
Milan Zorman ; Faculty of Mechanical Engineering, University of Maribor, Smetanova 17, SI-2000, Maribor, Slovenia


Full text: english pdf 1.188 Kb

page 1235-1242

downloads: 447

cite

Full text: croatian pdf 1.188 Kb

page 1235-1242

downloads: 808

cite


Abstract

Određivanju vremena izvršenja je vrlo važno u ranim fazama svakog projekta (npr. ponude, dizajn faza, itd.), a posebno u fazi planiranja. Ovaj rad predstavlja naš pristup procjeni vremena zavarivanja u svrhu planiranja proizvodnog procesa. Pristup se temelji na znanju stručnjaka za zavarivanje iz društva Nieros metala d.o.o. i na standardu za zavarivanje (međunarodni i unutarnji). Ekspertni sustav je razvijen na temelju semantičkih tehnologija za izračunavanje vremena zavarivanja u fazi projektiranja proizvoda. Sistem je snažno integriran sa glavnim ERP sustavom društva Nieros metala d.o.o. Rezultati eksperimenta su prikazani na kraju ovog članka.

Keywords

ekspertni sustav; ontologija; razvoj novih proizvoda; zavarivanje čelika

Hrčak ID:

185498

URI

https://hrcak.srce.hr/185498

Publication date:

31.7.2017.

Article data in other languages: english

Visits: 2.719 *