Skip to the main content

Original scientific paper

https://doi.org/10.17794/rgn.2020.1.8

ISTRAŽIVANJE SVEOBUHVATNOGA MODELA ZA PROCJENU OBRADBENOGA I OKOLIŠNOGA RIZIKA KOD VAĐENJA ARHITEKTONSKO-GRAĐEVNOGA KAMENA

Mojtaba Yari ; Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
Raheb Bagherpour ; Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
Mehrbod Khoshouei ; Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
Hossein Pedram ; Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran


Full text: english pdf 3.029 Kb

page 101-109

downloads: 529

cite


Abstract

Jedna od najopasnijih inženjerskih aktivnosti jesu rudarske operacije koje stoga zahtijevaju dodatne procjene rizika. Vađenje ukrasnoga kamena jedna je od glavnih rudarskih grana u Iranu. Trenutačno su Iran, Kina i Italija tri glavna proizvođača takva kamena u svijetu. Procjena rizika među temeljnim je aktivnostima kamenoloma. Jedan od glavnih postupaka toga procesa jest procjena rizika loma strukture (RLS). S tim ciljem modelirane su makrostrukure arhitektonsko-građevnoga kamena te su podijeljene u 17 razina. Jedan od najboljih postupaka za rangiranje rizika jest višeatributna metoda donošenja odluka koja povezuje brojne zavisne parametre. Nadalje, ocijenjeni su glavni rizici u najvećim kamenolomima uporabom metode preferirajućega rangiranja za poboljšanu procjenu (MPRPP). Na kraju su izračunani ekonomski rizik te rizici upravljanja i planiranja, koji ujedno imaju najveći utjecaj na opisane aktivnosti.

Keywords

procjena rizika; arhitektonsko-građevni kamen; fuzzy-AHP; rizik loma strukture; MPRPP

Hrčak ID:

234230

URI

https://hrcak.srce.hr/234230

Publication date:

17.2.2020.

Article data in other languages: english

Visits: 1.787 *