Geodetski list, Vol. 76 (99) No. 2, 2022.
Review article
As-Built Assessment Survey Workflow – Problems and Challenges
Aleksandra Król
; AGH University of Science and Technology, Krakow, Poland
Yasemin Sisman
orcid.org/0000-0002-6600-0623
; Ondokuz Mayıs University, Samsun, Turkey
Yuriy Rudyk
orcid.org/0000-0002-7372-5876
; Lviv State University of Life Safety, Lviv, Ukraine
Kamil Maciuk
orcid.org/0000-0001-5514-8510
; AGH University of Science and Technology, Krakow, Poland
Abstract
The purpose of this paper is to present the range of surveying works carried out during geodetic as-built inventory of buildings and utility infrastructure. The theoretical part of this essay complies grounds for legal basis on territory of Poland, which are core part of geodetic and cartographic studies. Moreover, the phases of geodetic as-built inventory are being discussed, in the light of applicable rules. Particular attention is being paid to the topic of situational and height measurements. The paper discusses methods of measurement used, precision groups and objects subjected to inventory measurement are being listed. The practical part of this paper regards surveying as-built inventory of single-family house. In this study we discuss the consequential procedures that contractors need to fallow during the construction process, this includes preliminary actions, field work, and individual elaboration of the findings. Post-completion documentation, gathered in the form of technical frame, after obtaining a positive verification test result was included in the Head Office of Geodesy and Cartography.
Keywords
building; inventory survey; as-built survey; Real Time Kinematic
Hrčak ID:
281103
URI
Publication date:
29.6.2022.
Visits: 1.210 *