Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20240115001267

Research on Building Process Optimization Framework Based on BIM-DT

Yiming Zhang ; College of Business Administration, Liaoning Technical University, Huludao 125105, China *
Kejian Shang ; School of Management, Henan University of Urban Construction, Pingdingshan 467041, Henan, China

* Corresponding author.


Full text: english pdf 930 Kb

page 1771-1779

downloads: 49

cite


Abstract

Aiming at the problems of low integration of enterprises in various parts of the construction process, low productivity, serious waste of resources, and poor construction safety, this project constructs a framework for optimizing the construction process based on BIM-DT through an in-depth analysis of the characteristics and development status of the digital twin technology and BIM technology. The framework is a complete cycle system, including data management system, BIM modeling system, and digital twin model, which are integrated with each stage of survey and design, construction preparation, construction, and operation and maintenance, respectively. Finally, in the empirical study, the construction phase is taken as the object of study, and the data management system is constructed to comprehensively demonstrate the realization process of each system, and the BP neural network is utilized for fault diagnosis.

Keywords

building information modeling; digital twin; intelligent optimization; whole building process

Hrčak ID:

320416

URI

https://hrcak.srce.hr/320416

Publication date:

31.8.2024.

Visits: 163 *