Skip to the main content

Professional paper

Simulation in Wood Industry. Part I

Mihály Varga ; University of West Hungary, Faculty of Wood Sciences, Sopron, Hungary
Etele Csanády ; University of West Hungary, Faculty of Wood Sciences, Sopron, Hungary
Zoltán Kocsis ; University of West Hungary, Faculty of Wood Sciences, Sopron, Hungary
Zalán Koppány Kovács ; University of West Hungary, Faculty of Wood Sciences, Sopron, Hungary


Full text: english pdf 123 Kb

page 177-182

downloads: 969

cite


Abstract

The aim of our project was to answer the question of our multinational window and door hardware manufacturing company as to whether it was worth building a new hall and increase the output or not. Of course there were also other important questions to answer, such as what kind of array of manufacturing machines should be, what is the minimum number of employees (including employee redundancy), what is the right timing for incoming parts and outgoing products, etc. Such questions are usually hard to answer with classical methods. Therefore we have choosen other ways to solve the problem: the solution was to create a simulation model and simulate all processes in order to get the required results and answers. For this project we used the program SIMUL8 Company’s SIMUL8 Professional.

Keywords

simulation; flow-simulation; utilization; throughput

Hrčak ID:

40888

URI

https://hrcak.srce.hr/40888

Publication date:

25.9.2009.

Article data in other languages: croatian

Visits: 2.191 *