Skip to the main content

Preliminary communication

Typical bridge details

Alex Kindij
Jure Radić
Zlatko Šavor


Full text: croatian pdf 1.143 Kb

page 881-891

downloads: 5.941

cite


Abstract

Results obtained during typical road bridge detail analyses, which are continuously made at the Department for Bridges of the Faculty of Civil Engineering, University of Zagreb, are presented in the paper. The analysis is based on: comparison of good and less good solutions applied on the existing structures, study of situation in the surrounding and EU countries, analysis of modern regulations, and efforts made to increase durability of structures. The details that meet all maintenance, durability and cost-efficiency criteria are recommended.

Keywords

bridge; typical details; completed structures; regulations; maintenance; durability; costs

Hrčak ID:

42899

URI

https://hrcak.srce.hr/42899

Publication date:

12.10.2009.

Article data in other languages: croatian

Visits: 6.923 *