Skip to the main content

Original scientific paper

Hydro generating units maintenance scheduling using Benders decomposition

Igor Kuzle ; Faculty of Electrical Engineering and Computing, University of Zagreb
Hrvoje Pandžić ; Faculty of Electrical Engineering and Computing, University of Zagreb
Miljenko Brezovec ; Croatian Power Board, (Hrvatska elektroprivreda d.d, HEP), power generation area Hydro North


Full text: croatian pdf 184 Kb

page 145-152

downloads: 1.799

cite

Full text: english pdf 184 Kb

page 145-152

downloads: 848

cite


Abstract

Maintenance of the power generating facilities in due time is essential for reliable and secure operation of the electric power system. In liberalized electricity market the economical aspects, pointed to the greatest possible revenue, have to be satisfied. On the other hand, technical aspects, which keep the power system above the desired level of safety and reliability, i.e. which are opposed to economical aspects, have to be satisfied as well. Therefore, these two opponent
standpoints have to be confronted in order to provide optimal solution which will comply with the strict technical limitations, and which will meet investor's economical requirements. This paper addresses the problem of obtaining the optimal maintenance schedule of hydro generating units. For this purpose, the paper discusses the mathematical programming method – Benders decomposition. After a brief description of the mathematical method, the application of the Benders decomposition on three Croatian hydroelectric power plants in a cascade on the Drava River is carried out.

Keywords

Benders decomposition; hydro generating units maintenance; maintenance scheduling; mathematical programming; optimization

Hrčak ID:

55432

URI

https://hrcak.srce.hr/55432

Publication date:

30.6.2010.

Article data in other languages: croatian

Visits: 3.989 *