The Connection between the Distance of the Suppliers and the Keeping of the Safety Stock
Keywords:
transportation, supplier selection, decision support systems, stock pilingAbstract
The objective of this research is revealing the connection between the distance of the suppliers and the keeping of the safety stock respectively the provision of the safety times when establishing the logistics strategy of the companies. In this article it will be analyzed when it is worth inserting safety time and when it is justified to holding safety stock so that the base materials, auxiliary materials and parts required for the production can be provided continuously according to the requirements. It will be assumed, that the increase of the distance does not always mean the increase of the transportation time as far as the directions are concerned. In this article, factors that play – besides the distance - a role in the variation of the transportation time are presented. In this research the proportion with which the size of the safety stock and the safety time required for the production when the distance is increasing are defined. Regarding the analyses products with various values, dimensions and needs of utilization are compared. In the final section is determined when it is worth choosing a supplier within a shorter geographic distance and in case of which products it is worth opting for the product that is offered at a lower price but being at a bigger distance.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
References
Cenigaa P., Sukalovab V. (2015), “Future of Logistics Management in the Process of Globalization”, Procedia Economics and Finance, Vol. 26, pp. 160 – 166.
Daniälle, B., Nijkamp P. (1999), “Globalization, transport and the environment: new perspectives for ecological economics”, Ecological Economics, Vol. 31, pp. 331–346.
Ghodsypour, S.H., O'Brien, C. (2001), “The total cost of logistics in supplier selection, under conditions of multiple sourcing, multiple criteria and capacity constraint”, Int. J. Production Economics, Vol. 73, pp. 15-27.
Heydari, J., Mahmoodi M., Taleizadeh, A. (2016), “Lead time aggregation: A three-echelon supply chain model”, Transportation Research Part E, Vol. 89, pp. 215–233.
Jian, M., Fang, X., Jin, L. (2015) – “The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model”, Transportation Research Part E, Vol. 84, pp. 61-72.
Kherbasha, O., Mocana, M., L. (2015), “A Review of Logistics and Transport Sector as a Factor of Globalization”, Procedia Economics and Finance, Vol. 27, pp. 42 – 47.
Lin, H. S. (2016), “Investing in lead-time variability reduction in a collaborative Vendor buyer supply chain model with stochastic lead time”, Computer & Operations Research, Vol. 72, pp. 43-49.
Miozzo, M., Dewick, P., Green, K. (2005), “Globalization and the environment: the long-term effects of technology on the international division of labor and energy demand”, Manchester School of Management, UMIST, University of Manchester, P.O. Box 88, Manchester M60 1QD, UK Futures, Vol. 37, pp. 521–546.
Rushton, A., Croucher, P., Baker, P. (2006), The Handbook of Logistics and Distribution Management, KoganPage, London
Wu, D., Olson, L.D. (2008), “Supply chain risk, simulation, and vendor selection”, Int. J. Production Economics, Vol. 114, pp. 646– 655.
Zhang, J., Zhang, M. (2011), “Supplier selection and purchase problem with fixed cost and constrained order quantities under stochastic demand”, Int. J. Production Economics, Vol. 129, pp. 1–7.