Skip to the main content

Professional paper

Passante Ferroviario railway tunnel in Milan

Davorin Kolić
Antonio Nicola
Anne Brissaud


Full text: croatian pdf 1.172 Kb

page 417-429

downloads: 893

cite


Abstract

The construction of the Passante Ferroviario railway tunnel in Milan, which links Porta Garibaldi and Porta Vittoria train stations, is presented in the paper. The tunnel route is made of three parts, and the total length is 4,568.00 m. Two tunnel tubes were drilled above the ground water level in alluvial, sandy and gravelly soil. The operation of the drilling machine EPB TBM that was used to drill the tunnel tubes is described. This was the first machine in Europe that was equipped with the chemical foam injection system based on an original solution.

Keywords

Passante Ferroviario railway tunnel; tunnel route; regional line; national line; train stations; EPB TBM machine; chemical foam

Hrčak ID:

68535

URI

https://hrcak.srce.hr/68535

Publication date:

31.5.2011.

Article data in other languages: croatian

Visits: 1.998 *