Građevinar, Vol. 63 No. 05., 2011.
Stručni rad
Passante Ferroviario railway tunnel in Milan
Davorin Kolić
Antonio Nicola
Anne Brissaud
Sažetak
The construction of the Passante Ferroviario railway tunnel in Milan, which links Porta Garibaldi and Porta Vittoria train stations, is presented in the paper. The tunnel route is made of three parts, and the total length is 4,568.00 m. Two tunnel tubes were drilled above the ground water level in alluvial, sandy and gravelly soil. The operation of the drilling machine EPB TBM that was used to drill the tunnel tubes is described. This was the first machine in Europe that was equipped with the chemical foam injection system based on an original solution.
Ključne riječi
Passante Ferroviario railway tunnel; tunnel route; regional line; national line; train stations; EPB TBM machine; chemical foam
Hrčak ID:
68535
URI
Datum izdavanja:
31.5.2011.
Posjeta: 1.998 *