Skip to the main content

Original scientific paper

Commissioning of current transformers

Marcus Stenner
Felix Feustel


Full text: english pdf 1.161 Kb

page 102-107

downloads: 1.238

cite


Abstract

Current transformers are the link between the primary and the secondary system and are therefore essential components of the electrical energy system. Their commissioning is an important phase of evaluating their proper functionality. Nowadays, is continuously decreasing. Moreover, it should be considered how the transformers and the protection system can be adequately tested within a reasonable timeframe. This paper discusses how a test plan for commissioning or refurbishing a substation might look.

Keywords

commissioning, CT analyzer, current transformers, measurement methods, tests

Hrčak ID:

263855

URI

https://hrcak.srce.hr/263855

Publication date:

8.10.2021.

Visits: 1.754 *