Skoči na glavni sadržaj

Prethodno priopćenje

INTERACTIVE SCHEDULING SYSTEM

Peter Bubeník
Dariusz Plinta


Puni tekst: engleski doc 206 Kb

str. 89-98

preuzimanja: 2.696

citiraj


Sažetak

This paper deals with the discussion on the use of simulation techniques for work order scheduling on the factory floor level of production and contains a description of the program electronic planning board with simulation elements for Finite Capacity Scheduling. The ability to implement simulation effectively for factory scheduling is dependent upon the availability of shop floor data and the response time for the evaluation process.

Ključne riječi

Hrčak ID:

19134

URI

https://hrcak.srce.hr/19134

Datum izdavanja:

20.12.2005.

Posjeta: 3.157 *