Skoči na glavni sadržaj

Izvorni znanstveni članak

Commissioning of current transformers

Marcus Stenner
Felix Feustel


Puni tekst: engleski pdf 1.161 Kb

str. 102-107

preuzimanja: 753

citiraj


Sažetak

Current transformers are the link between the primary and the secondary system and are therefore essential components of the electrical energy system. Their commissioning is an important phase of evaluating their proper functionality. Nowadays, is continuously decreasing. Moreover, it should be considered how the transformers and the protection system can be adequately tested within a reasonable timeframe. This paper discusses how a test plan for commissioning or refurbishing a substation might look.

Ključne riječi

commissioning, CT analyzer, current transformers, measurement methods, tests

Hrčak ID:

263855

URI

https://hrcak.srce.hr/263855

Datum izdavanja:

8.10.2021.

Posjeta: 1.015 *