Optimization of the process of efficiency management of the primary kaolin excavation on the curved face of the conditioned area

Authors

DOI:

https://doi.org/10.17794/rgn.2020.1.10

Keywords:

productivity, efficiency management, excavator, fractal dimension, mathematical model, the process of excavation

Abstract

The influence of primary kaolin moisture on the duration of bucket unloading is proven, and the analytical dependence for the estimation of this ratio in the form of a second-degree polynomial is obtained. Three main technological schemes for different technological conditions substantiate the procedure for evaluating the productivity of the primary kaolin excavation for cases of selective development of curvilinear sections on the basis of the first proposed technological coef- ficient of the contact form, which takes into account the fractal nature of the section’s shape, are suggested in the article. It is first proposed to include the specific time of shifting in the working cycle of backhoe type excavators. The mathe- matical models of the primary kaolin excavation process on the curved face of the conditioned area with a backhoe type excavator for different varieties of the mutual arrangement of the hydraulic excavator and the hauler are developed.

Author Biographies

Ruslan Sobolevskyi, Zhytomyr Polytechnic State University

DSc.Eng., Professor
Department of Mine Surveying, Faculty of Mining and Ecology

Valentyn Korobiichuk, Zhytomyr Polytechnic State University

PhD.Eng., Associate Professor
Department of Geotechnologies named after Professor Bakka M.T., Faculty of Mining and Ecology,

Volodymyr Levytskyi, Zhytomyr Polytechnic State University

Faculty of Mining and Ecology

Department of Mine Surveying

Victor Pidvysotskyi, Zhytomyr Polytechnic State University

PhD.Eng., Professor
Department of Geotechnologies named after Professor Bakka M.T., Faculty of Mining and Ecology

Oleksandr Kamskykh, Zhytomyr Polytechnic State University

PhD.Eng., Associate Professor
Department of Geotechnologies named after Professor Bakka M.T., Faculty of Mining and Ecology

Liudmyla Kovalevych, Zhytomyr Polytechnic State University

Mr.Eng., Department of Mine Surveying, Faculty of Mining and Ecology

Downloads

Published

2020-01-24

How to Cite

Ruslan Sobolevskyi, Valentyn Korobiichuk, Levytskyi, V., Victor Pidvysotskyi, Oleksandr Kamskykh, & Liudmyla Kovalevych. (2020). Optimization of the process of efficiency management of the primary kaolin excavation on the curved face of the conditioned area. Rudarsko-geološko-Naftni Zbornik, 35(1). https://doi.org/10.17794/rgn.2020.1.10

Issue

Section

Mining