Metalurgija, Vol. 51 No. 4, 2012.
Prethodno priopćenje
Evaluation of benefits resulting from innovation of input raw materials dosing process in sintering
P. Besta
; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
A. Samolejová
; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
K. Janovská
; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
M. Lampa
; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
R. Lenort
; Faculty of Metallurgy and Materials Engineering, VŠB – Technical University of Ostrava, Ostrava, Czech Republic
Sažetak
Production of blast furnace sinter is among the processes with the highest energy and material requirements. Fuel consumption is especially significant cost item here. The presence of grate sintered in charge, i.e. return sinter from 12 to 22 mm in size, can have fundamental impact on the technical and economic indicators of the sintering process. Grate sinter can be used as a foundation layer under the sintering mixture, to increase air permeability of charge and to improve the gas-dynamic conditions. The article analyzes the impact of grate sinter on the sintering process, based on an analysis of the acquired production indicators within the scope of the research in question.
Ključne riječi
sintering process; iron; iron ore; costs
Hrčak ID:
82905
URI
Datum izdavanja:
1.10.2012.
Posjeta: 1.742 *